Bird - Bird Heavy Civil Ltd.
Home  >  Expertise & Projects  >  Civil Works  >  HVdc Specialties at Soldiers Pond

Civil Works

HVdc Specialties at Soldiers Pond

Client:
Nalcor Energy
Location:
Soldiers Pond, Newfoundland and Labrador
Expertise:
Civil Works
The general scope of the project is as follows:
  • Concrete foundations (including excavation and backfill) and concrete floor slabs for:
    • Two (2) HVdc Valve Hall Buildings measuring 32m wide x 17m long each
    • HVdc Control Building measuring 29m wide x 70.8m long
    • AC Substation Building  measuring  15.5.m wide x 43.0m long
  • Supply and erect building structural steel, roofing, cladding for:
    • Two (2) HVdc Valve Hall Buildings measuring 32m wide x 17m long each
    • HVdc Control Building measuring 29m wide x 70.8m long
  • Concrete foundations for seven (7) exterior transformer equipment foundations complete with spill containment facilities and fire walls
  • Concrete foundations for various exterior ancillary mechanial/electrical  equipment foundations
  • Concrete foundations for AC Substation equipment and tower foundations
  • Installation of underground conduits encased in concrete ductbanks
  • Installation of an oil/water separator system
  • Installation of a septic system
  • General yard grading, topping and fencing requirements
To construct and erect the buildings, we have engaged the Bird St. John’s team to lead and manage this scope of work. 
 
Search
Careers

Current Openings

Warehouse / Parts Room Attendant H.J. O'Connell Construction Ltd. an ISO 9001-2008 registered company, is currently rectuiting a Warehouse / Parts Room...
Chief Estimator Overseeing the daily activities of the estimating staff, the Chief Estimator ensures that all work activities are completed...
+More